How much does a post-construction cleaning cost? Our prices with full transparency
It's the first question we get asked, and many cleaning companies answer with silence: no prices shown, just a form. At Ménage Parfait, we do the opposite. We give you our price ranges per square metre, we explain what makes them vary, and our estimator prices your site in seconds. You'll know what to expect before even requesting your quote.
Since 2010, we have been carrying out end-of-construction cleaning for offices, shops, houses and site bases in Paris and Île-de-France, with employed agents and clear pricing, with no hidden fees.
- Insured cleaners.
- Free replacement.
- Best customer service.
- Affordable pricing.
- Top 5% cleaners.
Calculate the cost of your post-construction cleaning
Enter your floor area and the actual condition of the site: the budget appears instantly, with no form and no sign-up. You will know what to expect before you even call us.
How much does post-construction cleaning cost in Paris?
In Paris, post-construction cleaning costs between €4 and €16 excl. VAT per m² depending on the state of the premises: €4–6 for a lightly soiled site, €7–10 for a standard renovation, €12–16 after heavy works. Below 80 m², the job is priced as a flat fee starting at €350 excl. VAT (€420 incl. VAT). The per-m² rate tapers above 150 m².
How much does a post-construction cleaning cost per m²?
Post-construction cleaning is charged per square metre, depending on the condition of the site. Here are our indicative ranges:
Essential
Lightly soiled construction site
Complete dusting of all surfaces
Floor and skirting board cleaning
Sanitary cleaning
Tidying and removal of light waste
€4 to €6/m² excl. VAT
Premium
Standard renovation / finishing
Everything in the Essential formula included
Window and glass cleaning
Paint and glue degreasing
Tile and grout cleaning
€7 to €10/m² excl. VAT
Prestige
Heavy works or new construction
Everything in the Premium formula included
Cement render removal
Light rubble removal
Floor protection and cleaning
Multiple passes if necessary
€12 to €16/m² excl. VAT
Our rate is degressive: the larger the area to be treated, the lower the price per m². Small areas are at the top of the range, large areas at the bottom. For very small areas or highly targeted interventions, a minimum flat rate or hourly billing may apply.
Small areas: why the per-m² rate does not apply below 80 m²
This is the question we hear most often on the phone: "my flat is 45 m², so why don't I pay 45 times your per-m² rate?" The answer lies in the real cost structure. On a construction site, floor area determines only part of the time spent. Travelling across Paris with equipment, parking, the preliminary site survey, unloading the wet-and-dry vacuum, assembling the rotary machine and reloading at the end of the day account for two to three unavoidable hours, identical for 40 m² and for 400 m².
On a 500 m² floor plate those hours are diluted and the per-m² rate falls naturally. In a studio flat, they account for most of the invoice. A provider mechanically applying €5/m² to 45 m² will quote €225 — an amount that covers neither the travel, nor the social contributions for a two-person team, nor the consumables. They will end up rushing the job, invoicing unexpected extras, or both. We prefer to state the flat fee up front.
| Package | What is included | Excl. VAT | Incl. VAT |
|---|---|---|---|
| Essential | Full dusting, floor washing, sanitary facilities, interior glazing | from €350 | from €420 |
| Premium | Essential + adhesive, paint and silicone marks, joinery, glazing both sides | from €450 | from €540 |
| Prestige | Premium + floor stripping, protection of new surfaces, photo report | from €650 | from €780 |
Which VAT applies to post-construction cleaning?
We invoice our post-construction cleaning with 20% VAT, whether the client is an individual, a property dealer or a company.
- 20% VAT. This is the rate we apply on all our post-construction cleaning invoices.
- Cleaning included in your works? If the cleaning is invoiced by your building contractor under its own contract, the contractor determines the applicable VAT rate.
- Tax credit. We do not apply the personal-services tax credit to this service. For any tax question, check with your adviser or the tax authorities.
Some concrete examples
Indicative estimates — to be adjusted according to the actual condition of the site:
Apartment after works (standard)
60 m²
~€450 to €640 excl. VAT
House after renovation (standard)
150 m²
~€1,100 to €1,580 excl. VAT
Lightly soiled office floor
500 m²
~€1,330 to €1,990 excl. VAT
Large surface area
> 1 000 m²
Degressive rate — on quote
These amounts are given as an indication. Only a visit allows a precise quote — free and without commitment.
What influences your post-construction cleaning rate
The surface area — Primary factor, with a degressive rate per m².
The level of soiling — Light dusting does not cost the same as stripping with cement render and multiple passes.
The type of construction — After works, renovation, new construction: each requires different treatments.
Accessibility and levels — Floors, stairs, high windows increase the intervention time.
Indoor and outdoor — A house with terrace and surroundings requires more than an apartment.
Urgency and schedules — A weekend or emergency intervention may incur a surcharge.
Individuals and businesses: 20% VAT
Our post-construction cleaning prices are shown excluding VAT. We invoice this service with 20% VAT, for individuals and businesses alike:
20% VAT on all our post-construction cleaning invoices.
Amount excl. VAT, VAT and total incl. VAT itemised on the quote and the invoice.
We apply neither reduced VAT nor a tax credit to this service.
Tax question? Check with your adviser or the tax authorities: our itemised invoice lets you claim any entitlement.
The 50% tax credit remains available on our regular home cleaning services, under the conditions set by law.
A free, clear and commitment-free quote
You contact us
By phone or via the online form, with some information about your construction site.
We assess
On-site visit, or photo study for simple construction sites.
You receive a detailed quote
Within 2h, item by item, no hidden fees, excl. and incl. VAT (20%).
Discover our construction cleaning services
Frequently asked questions about post-construction cleaning rates
- Why do you display your prices when many companies do not?
For transparency. Rather than leaving you without a reference, we indicate our ranges per m² according to the condition of the site. The exact price is then confirmed after assessment, for a fair quote with no nasty surprises. - What is the average price per m² for a post-construction cleaning?
Generally allow €4 to €16/m² excl. VAT depending on site condition: €4–6/m² for a lightly soiled site, €7–10/m² for a standard renovation, €12–16/m² for heavy works or a new build. Under 80 m², flat rate from €350 excl. VAT. Degressive above 150 m². Free quote after a visit or from photos. - Is cleaning charged per m² or per hour?
Most often per m², as the surface area determines most of the work. For small surfaces or certain recurring services, such as maintaining a site base, we quote per hour or by frequency. - Does the rate decrease for large surfaces?
Yes. Our rate per m² is degressive: the larger the surface, the lower the price per m². - Is the quote chargeable?
No. The quote is free, detailed and without commitment, issued within 2h. - Is post-construction cleaning eligible for the tax credit?
We invoice post-construction cleaning with 20% VAT and do not apply the personal-services tax credit to it. If you think you may be entitled to a tax benefit, check with your adviser or the tax authorities: our itemised invoice lets you claim it. - How much does post-construction cleaning cost for a 50 m² apartment in Paris?
Allow €450 to €640 excl. VAT, i.e. €540 to €770 incl. VAT, for a standard renovation, or €350 to €410 excl. VAT for a lightly soiled site. Under 80 m², we apply a flat rate rather than a per-m² rate, because travel, the technical visit and setting up equipment do not shrink with the surface. Our minimum flat rate is €350 excl. VAT (€420 incl. VAT). - Is the price shown by the estimator a firm quote?
No, it is an indicative estimate built from our real rates. The final price is confirmed after a free site survey or, for straightforward jobs, a photo assessment. The gap is usually small: the estimator already factors in floor area, site condition, type of premises and additional services. - Why are your rates not the cheapest on the market?
Because our 35 staff are permanently employed, trained and insured, and we use European Ecolabel certified products. A provider charging €2 or €3 per m² can only cover those costs by cutting time on site or working outside the social framework. On a construction site, that shows up as plaster marks on the ceiling and cement laitance on new parquet. - Do you carry out urgent work before a handover?
Yes. We operate seven days a week, including Sundays and evenings, for sites constrained by a delivery date, works acceptance or an inventory of fixtures. A 25 % surcharge applies to work outside 7am–8pm, at weekends or within 48 hours. Call 01 89 19 68 69 to check our availability.
Request your post-construction cleaning quote
Describe your construction site to us, we will respond within 2h with a clear and detailed quote. Service available throughout Paris and Île-de-France.
- Phone: 01 89 19 68 69
- Email: [email protected]
- Online: Request a free quote