How much does a post-construction cleaning cost? Our prices with full transparency

Tarif nettoyage fin de chantier Paris - Menage Parfait

It's the first question we get asked, and many cleaning companies answer with silence: no prices shown, just a form. At Ménage Parfait, we do the opposite. We give you our price ranges per square metre, we explain what makes them vary, and we show you how an individual can cut their bill in half thanks to the tax credit. You'll know what to expect before even requesting your quote.

Since 2010, we have been carrying out end-of-construction cleaning for offices, shops, houses and site bases in Paris and Île-de-France, with employed agents and clear pricing, with no hidden fees.

  • 200% Guarantee.
  • Bonded & Insured Cleaners
  • 5 star Rated service.
Instant estimate

Calculate the cost of your post-construction cleaning

Enter your floor area and the actual condition of the site: the budget appears instantly, with no form and no sign-up. You will know what to expect before you even call us.

Condition of the site
Type of premises
Additional services
Your estimate
HT
Minimum call-out applied. Below 80 m², travel, the site survey and equipment set-up remain the same whatever the floor area.
Your rate against the Paris market
2 €/m²10 €/m²25 €/m²
Get my detailed quote
Or call us: 01 89 19 68 69
Indicative estimate. The final price is confirmed after a free, no-obligation site survey or photo assessment.

How much does post-construction cleaning cost in Paris?

In Paris, post-construction cleaning costs between €4 and €16 excl. VAT per m² depending on the state of the premises: €4–6 for a lightly soiled site, €7–10 for a standard renovation, €12–16 after heavy works. Below 80 m², the job is priced as a flat fee starting at €350 excl. VAT (€420 incl. VAT). The per-m² rate tapers above 150 m².

How much does a post-construction cleaning cost per m²?

Post-construction cleaning is charged per square metre, depending on the condition of the site. Here are our indicative ranges:

Essential

Lightly soiled construction site

  • okComplete dusting of all surfaces
  • okFloor and skirting board cleaning
  • okSanitary cleaning
  • okTidying and removal of light waste

2 to 4 €/m² excl. tax

Premium

Standard renovation / finishing

  • okEverything in the Essential formula included
  • okWindow and glass cleaning
  • okPaint and glue degreasing
  • okTile and grout cleaning

5 to 8 €/m² excl. tax

Prestige

Heavy works or new construction

  • okEverything in the Premium formula included
  • okCement render removal
  • okLight rubble removal
  • okFloor protection and cleaning
  • okMultiple passes if necessary

9 to 14 €/m² excl. tax

Our rate is degressive: the larger the area to be treated, the lower the price per m². Small areas are at the top of the range, large areas at the bottom. For very small areas or highly targeted interventions, a minimum flat rate or hourly billing may apply.

Small areas: why the per-m² rate does not apply below 80 m²

This is the question we hear most often on the phone: "my flat is 45 m², so why don't I pay 45 times your per-m² rate?" The answer lies in the real cost structure. On a construction site, floor area determines only part of the time spent. Travelling across Paris with equipment, parking, the preliminary site survey, unloading the wet-and-dry vacuum, assembling the rotary machine and reloading at the end of the day account for two to three unavoidable hours, identical for 40 m² and for 400 m².

On a 500 m² floor plate those hours are diluted and the per-m² rate falls naturally. In a studio flat, they account for most of the invoice. A provider mechanically applying €5/m² to 45 m² will quote €225 — an amount that covers neither the travel, nor the social contributions for a two-person team, nor the consumables. They will end up rushing the job, invoicing unexpected extras, or both. We prefer to state the flat fee up front.

Package What is included Excl. VAT Incl. VAT
Essential Full dusting, floor washing, sanitary facilities, interior glazing from €350 from €420
Standard Essential + adhesive, paint and silicone marks, joinery, glazing both sides from €450 from €540
Complete Standard + floor stripping, protection of new surfaces, photo report from €650 from €780
💡 The benchmark to remember: a 50 m² Paris apartment after a standard renovation falls between €400 and €500 excl. VAT, or €480 to €600 incl. VAT. A 60 m² flat rises to €420–600 excl. VAT. Above 80 m², we revert to the per-m² rate, which works out better for you.

VAT at 10 % or 20 % on post-construction cleaning: what actually applies

This is the point on which the most inaccurate information circulates, including on specialist websites. Many state "VAT at 10 % if the property is more than two years old". That holds for renovation works — but post-construction cleaning invoiced separately is a service, and falls under the standard rate.

  • 20 % VAT — the general case. When we invoice post-construction cleaning directly, whether the client is a private individual, a property trader or a main contractor, the applicable rate is 20 %.
  • 10 % VAT — the exception. The reduced rate applies only where the cleaning is folded by the works contractor into a single global contract covering a dwelling completed more than two years ago. It then follows the rate of the main works, and it is the works contractor who invoices, not us.
  • No tax credit. Despite our Services à la Personne accreditation no. 2023-433, post-construction cleaning does not qualify as routine domestic cleaning. It therefore does not give entitlement to the 50 % tax credit, unlike our regular maintenance services.
⚠️ Be wary of a quote showing 10 % VAT on post-construction cleaning invoiced on its own. In the event of an audit, the reassessment falls on the client as much as on the provider. We would rather display 20 % and a fair price than an attractive rate and a correction six months later.

Some concrete examples

Indicative estimates — to be adjusted according to the actual condition of the site:

Apartment after works (standard)

60 m²

~400 to 500 € excl. tax

House after renovation (standard)

150 m²

~900 to 1 200 € excl. tax

Lightly soiled office floor

500 m²

~1 500 to 2 000 € excl. tax

Large surface area

> 1 000 m²

Degressive rate — on quote

These amounts are given as an indication. Only a visit allows a precise quote — free and without commitment.

What influences your post-construction cleaning rate

  • okThe surface area — Primary factor, with a degressive rate per m².
  • okThe level of soiling — Light dusting does not cost the same as stripping with cement render and multiple passes.
  • okThe type of construction — After works, renovation, new construction: each requires different treatments.
  • okAccessibility and levels — Floors, stairs, high windows increase the intervention time.
  • okIndoor and outdoor — A house with terrace and surroundings requires more than an apartment.
  • okUrgency and schedules — A weekend or emergency intervention may incur a surcharge.

Individuals: up to 50% savings

If you are an individual and the construction concerns your home, the domestic cleaning part of our service may entitle you to a 50% tax credit, thanks to our personal services declaration (SAP 2023-433):

  • ok50% of the amounts paid, up to a ceiling of 12 000 €/year per household.
  • okImmediate advance possible: you only pay half, without waiting for the tax return.
  • okReduced VAT at 10% on the eligible domestic cleaning service.
  • okTax credit reimbursed even if you are not taxable.

Please note: the advantage concerns the domestic home cleaning part for individuals — clearance, rubble removal and travel costs are not eligible, nor are services in professional premises. For businesses, these costs are generally tax-deductible.

A free, clear and commitment-free quote

You contact us

By phone or via the online form, with some information about your construction site.

We assess

On-site visit, or photo study for simple construction sites.

You receive a detailed quote

Within 2h, item by item, with no hidden fees, with the tax credit eligible amount indicated for individuals.

Frequently asked questions about post-construction cleaning rates

  • Why do you display your prices when many companies do not?
    For transparency. Rather than leaving you without a reference, we indicate our ranges per m² according to the condition of the site. The exact price is then confirmed after assessment, for a fair quote with no nasty surprises.
  • What is the average price per m² for a post-construction cleaning?
    Generally count on 2 to 14 €/m² depending on the condition of the site: 2 to 4 €/m² for a lightly soiled site, 5 to 8 €/m² for a standard renovation, 9 to 14 €/m² for heavy works or new construction. The rate is degressive for large surfaces. Free quote after visit.
  • Is cleaning charged per m² or per hour?
    Most often per m², as the surface area determines most of the work. For small surfaces or certain recurring services, such as maintaining a site base, we quote per hour or by frequency.
  • Does the rate decrease for large surfaces?
    Yes. Our rate per m² is degressive: the larger the surface, the lower the price per m².
  • Is the quote chargeable?
    No. The quote is free, detailed and without commitment, issued within 2h.
  • Can I reduce the cost with the tax credit?
    For individuals, the domestic cleaning part may entitle you to a 50% tax credit, within the limits of the caps, which divides your real cost by two.
  • How much does post-construction cleaning cost for a 50 m² apartment in Paris?
    Expect between €400 and €500 excl. VAT, or €480 to €600 incl. VAT, for a standard renovation. Below 80 m² we apply a flat fee rather than a per-m² rate, because travel, the site survey and equipment set-up do not shrink with floor area. Our minimum call-out is €350 excl. VAT (€420 incl. VAT).
  • Is the price shown by the estimator a firm quote?
    No, it is an indicative estimate built from our real rates. The final price is confirmed after a free site survey or, for straightforward jobs, a photo assessment. The gap is usually small: the estimator already factors in floor area, site condition, type of premises and additional services.
  • Why are your rates not the cheapest on the market?
    Because our 35 staff are permanently employed, trained and insured, and we use European Ecolabel certified products. A provider charging €2 or €3 per m² can only cover those costs by cutting time on site or working outside the social framework. On a construction site, that shows up as plaster marks on the ceiling and cement laitance on new parquet.
  • Do you carry out urgent work before a handover?
    Yes. We operate seven days a week, including Sundays and evenings, for sites constrained by a delivery date, works acceptance or an inventory of fixtures. A 25 % surcharge applies to work outside 7am–8pm, at weekends or within 48 hours. Call 01 89 19 68 69 to check our availability.

Request your post-construction cleaning quote

Describe your construction site to us, we will respond within 2h with a clear and detailed quote. Service available throughout Paris and Île-de-France.

Gagnez jusqu'a -20%
sur votre 1er nettoyage !

Resultat immediat dans votre boite mail

Tournez la roue et gagnez !

Copiez ce code lors de votre reservation. Valable 30 jours.